Resource Type

Journal Article 934

Conference Videos 47

Conference Topics 1

Year

2024 3

2023 67

2022 93

2021 60

2020 59

2019 59

2018 71

2017 61

2016 53

2015 81

2014 30

2013 51

2012 30

2011 43

2010 45

2009 34

2008 25

2007 33

2006 11

2005 17

open ︾

Keywords

maximum power point tracking (MPPT) 11

wind power 10

optimization 9

manufacturing power 8

renewable energy 8

control 7

nuclear power plant 7

power quality 6

sustainable development 6

automobile power 5

simulation 5

China 4

coal 4

manufacturing 4

modeling 4

offshore wind power 4

power generation 4

smart grid 4

wind turbine 4

open ︾

Search scope:

排序: Display mode:

Precision Blasting Excavation of Underground Workshop Crane Beam of Rock Wall in Complicated Geology Condition

Li Changneng,Xu Chengguang

Strategic Study of CAE 2014, Volume 16, Issue 11,   Pages 42-47

Abstract:

The geology condition of Xiang jiaba hydraulic power station underground

Keywords: Xiang jiaba hydraulic power station     underground workshop     crane beam of rock wall     precision blasting    

Successful Practice in Management Reform——An Analysis of Experiences with Guangzhou Pumped Storage PowerStation

Luo Shaoji

Strategic Study of CAE 2000, Volume 2, Issue 11,   Pages 52-59

Abstract:

The 2 400 MW Guangzhou pumped storage project became fully operational in March 2000, thus establishing itself as the biggest of its kind in the world.

Based upon successful experiences with the project, the author spotlights the management practices in the four parts: that is project management improvements, reforms on construction management, reforms on plant operation management and reforms on business strategy. Thanks to the above-said reform efforts, the project turns out to be quite a success in terms of cost saving, fast progress, good engineering quality, rich returns plus a friendly environment.

Keywords: Pumped storage     power station     management     reform    

Availability growth models and verification of power equipment

Jinyuan SHI, Jiamin XU

Frontiers in Energy 2021, Volume 15, Issue 2,   Pages 529-538 doi: 10.1007/s11708-019-0624-0

Abstract: availability growth models for large scale complicated repairable system such as electric generating units, powerstation auxiliaries, and transmission and distribution installations are presented.Availability growth models for electric generating units, power station auxiliaries, and transmissionunits and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmissionstation auxiliaries, transmission and distribution installations conform to the power function, and

Keywords: repairable system     power equipment     electric generating unit     power station auxiliary     transmission and distribution    

A Feasibility Study of Power Generation from Sewage Using a Hollowed Pico-Hydraulic Turbine

Tomomi Uchiyama, Satoshi Honda, Tomoko Okayama, Tomohiro Degawa

Engineering 2016, Volume 2, Issue 4,   Pages 510-517 doi: 10.1016/J.ENG.2016.04.007

Abstract:

This study is concerned with the feasibility of power generation using a pico-hydraulic turbine fromconnection points to the Toyogawa River-Basin Sewerage, Japan, was explored for over a year to elucidate the hydraulicSecond, the performance of the pico-hydraulic turbine was investigated via laboratory experiments thatThis study indicates that the connection points have hydraulic potential that can be used for power generationIt also demonstrates that the pico-hydraulic turbine can be usefully employed for power generation from

Keywords: Pico-hydraulic turbine     Sewage     Power generation     Connection point     Hydraulic potential    

Design and characteristic research of a novel electromechanical-hydraulic hybrid actuator with two transmission

Frontiers of Mechanical Engineering 2023, Volume 18, Issue 2, doi: 10.1007/s11465-022-0735-x

Abstract: Servo-hydraulic actuators (SHAs) are widely used in mechanical equipment to drive heavy-duty mechanismsThis study proposes and designs a novel electromechanical-hydraulic hybrid actuator (EMHA) that integratescontrol scheme of the electromechanical transmission mechanism is used for motion control, and the hydraulictransmission mechanism is used for power assistance.Compared with the valve-controlled hydraulic cylinder system, EMHA exhibits a velocity tracking error

Keywords: electromechanical-hydraulic hybrid actuator (EMHA)     integration     transmission mechanisms     power assistance    

Developing and practice of QLY2150-full circle slewing and tyre type crane for erecting wind power station

Huang Yaoyi,Zhang Zhihua,Jing Haizhou,Dai Yu

Strategic Study of CAE 2010, Volume 12, Issue 11,   Pages 105-112

Abstract: ="text-align: justify;">The paper briefly introduced internal and external situation about the wind powerstation construction and the newly developing plan for the wind power station construction of our countrymethods about the developing subject of QLY2150-full circle slewing and tyre type crane for erecting wind powerstation which proposed based on the above situation; finally introduced the states of the prototypebe used in construction of wind power station , and pointed out some great superiorities of this new

Keywords: wind power station     special purpose     crane     new type     developing     practice    

Tianwan Nuclear Power Station in Construction-the Rising Pearl of the Orient

null

Strategic Study of CAE 2002, Volume 4, Issue 2,   Pages 92-93

The design of Three Gorges Hydropower Station

Zhou Shuda,Xie Hongbing

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 78-84

Abstract: numerical simulation techniques, some technical problems were studied systematically, including layout of powerstation, measures of sediment and floating debris discharging, types of intake, embedded types of spiral

Keywords: Three Gorges Power Station     layout     sediment and floating debris discharging     spiral case embedding    

Analysis on Load Generating Electricity State of Mining Hydraulic Winder

Peng Youduo,Liu Fanmao,Yu Bing,He Fenghua,Hu Yanping

Strategic Study of CAE 2006, Volume 8, Issue 12,   Pages 97-101

Abstract:

In the working condition of put-down loadbearing, the winders electromotor runs in electric powergeneration mode and feeds back power to eletricity net.This paper introduced the electric power generation working condition of mining hydaulic winder´s electromotor analysed the main parameters of electric power and calculated the feedback average power

Keywords: mine hydraulic winder     power generation unde the condition of loadbearing     feedback power     average power    

Characters of Future Aircraft Hydraulic System

Wang Zhanlin,Chen Bin

Strategic Study of CAE 1999, Volume 1, Issue 3,   Pages 5-10

Abstract:

High density of driving power, fast response, high rigidity and high-precision are the advantagesof hydraulic servo system, so it is widely used in aerospace.All of flight actuator and transmitting systems of today´s aircrafts are nearly driven by hydraulicIn this paper, main developmental trend of airborne hydraulic system, especially for military aircraftLight weight, small size, high-pressure, high power, variable pressure, intellectualization, integration

Keywords: airborne hydraulic systems     high-pressure     variable pressure     redundancy     power-by-wire    

The “Tiangong” Chinese Space Station project

Yang HONG

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 278-283 doi: 10.15302/J-FEM-2018202

Keywords: manned space station     space station project     basic design    

Analysis and design of pulse frequency modulation dielectric barrier discharge for low power applications

Tang-tang GUO,Xing-liang LIU,Shi-qiang HAO,Chi ZHANG,Xiang-ning HE

Frontiers of Information Technology & Electronic Engineering 2015, Volume 16, Issue 3,   Pages 249-258 doi: 10.1631/FITEE.1400185

Abstract: For low power dielectric barrier discharge (DBD) used in small-size material treatment or portable devicesIn this paper, steady-state analysis of the low power DBD is presented, considering the inevitable parasiticfrequency and the derived expressions are accurate and convenient for the analysis and design of the powerparameters, including the frequency range and the applied electrode voltage, is discussed when the power

Keywords: Dielectric barrier discharge     Rectifier-compensated first harmonic approximation     Parasitic capacitance     Power    

Comparison of shallow tunneling method with pile and rib method for construction of subway station in

Sina AMIRI; Ali Naghi DEHGHAN

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 6,   Pages 704-717 doi: 10.1007/s11709-021-0746-4

Abstract: First, by selecting Station Z6 located in the Tehran Subway Line 6 as a case study, the constructionThe maximum ground settlement of 29.84 mm obtained from this method was related to the station axis,instrumentation data indicated the confirmation and accuracy of the excavation and construction process of Stationvalidated by instrumentation data, the value of the ground surface settlement was investigated during the stationSTM, it is possible to optimize some critical geometric parameters of the support system during the station

Keywords: shallow tunneling method     pile and rib method     ground surface settlement     subway station construction    

Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century

黄新生

Strategic Study of CAE 1999, Volume 1, Issue 1,   Pages 86-86

Understanding the demand predictability of bike share systems: A station-level analysis

Frontiers of Engineering Management   Pages 551-565 doi: 10.1007/s42524-023-0279-8

Abstract: Using Divvy bike-share one-year data from Chicago, USA, we measured demand entropy and quantified the station-levelLastly, we identified that key factors contributing to station-level entropy and predictability includeper capita income, spatial eccentricity, and the number of parking lots near the station.understanding of BSS demand prediction, which can help decision makers and system operators anticipate diverse station-level

Keywords: bike share systems     demand prediction     prediction errors     machine learning     entropy    

Title Author Date Type Operation

Precision Blasting Excavation of Underground Workshop Crane Beam of Rock Wall in Complicated Geology Condition

Li Changneng,Xu Chengguang

Journal Article

Successful Practice in Management Reform——An Analysis of Experiences with Guangzhou Pumped Storage PowerStation

Luo Shaoji

Journal Article

Availability growth models and verification of power equipment

Jinyuan SHI, Jiamin XU

Journal Article

A Feasibility Study of Power Generation from Sewage Using a Hollowed Pico-Hydraulic Turbine

Tomomi Uchiyama, Satoshi Honda, Tomoko Okayama, Tomohiro Degawa

Journal Article

Design and characteristic research of a novel electromechanical-hydraulic hybrid actuator with two transmission

Journal Article

Developing and practice of QLY2150-full circle slewing and tyre type crane for erecting wind power station

Huang Yaoyi,Zhang Zhihua,Jing Haizhou,Dai Yu

Journal Article

Tianwan Nuclear Power Station in Construction-the Rising Pearl of the Orient

null

Journal Article

The design of Three Gorges Hydropower Station

Zhou Shuda,Xie Hongbing

Journal Article

Analysis on Load Generating Electricity State of Mining Hydraulic Winder

Peng Youduo,Liu Fanmao,Yu Bing,He Fenghua,Hu Yanping

Journal Article

Characters of Future Aircraft Hydraulic System

Wang Zhanlin,Chen Bin

Journal Article

The “Tiangong” Chinese Space Station project

Yang HONG

Journal Article

Analysis and design of pulse frequency modulation dielectric barrier discharge for low power applications

Tang-tang GUO,Xing-liang LIU,Shi-qiang HAO,Chi ZHANG,Xiang-ning HE

Journal Article

Comparison of shallow tunneling method with pile and rib method for construction of subway station in

Sina AMIRI; Ali Naghi DEHGHAN

Journal Article

Ertan Hydropower Station-The Largest Hydropower Station in China Built in this Century

黄新生

Journal Article

Understanding the demand predictability of bike share systems: A station-level analysis

Journal Article